News

[亚洲色在线无码国产精品]室内设计 平面布置图 英文


亚洲色在线无码国产精品

大家好今天来介绍的问题,亚洲色在线无码国产精品,以下是小编对此问题的归纳整理,来看看吧。

求有关室内设计的专业英语词汇。

文章目录列表:

求有关室内设计的专业英语词汇。

方案 :Design, Scheme
初步设计 :Primary Design
施工图 CD: Construction DesignFuction 功能区Light 灯具Droplight 吊灯 吸顶灯Entrance 入口Living room 客厅Sitting room 起居室Embed light 嵌灯Dinning room 餐厅Daylight lamp 日光灯Kitchen 厨房Reflect down light 筒灯Office 书房Quartz down-light 石英灯Master bedroom 主卧房Votage track light 射灯Quest bedroom 客卧Track light 轨道灯Children bedroom 儿童房Picture light 镜画灯Hiding light 暗藏灯管Projection room 视听室Dressing room 更衣室Wall lamp 壁灯Storeroom 储藏室Reading lamp 台灯Master bathroom 主卫Floor lamp 落地灯Bathroom 卫生间Bathroom fixture 卫生洁具Wash room 洗衣房Staircase 楼梯Washbowl 洗手台[台盆]Aisle 过道Water faucet 水龙头Closestool 座便器Gazebe 阳台Urinal 小便斗Garden 花园Bathtab 浴缸Swimming pool 游泳池Shower bath 淋浴房Furniture 家具Wiring 电器设备Cupboard 厨房橱柜Television 电视机Drink box 酒柜Sound box 音响Bar 吧台Washer 洗衣机Dinning table 餐桌Bedstand 床头柜Bed 床Bookcase 书柜Chest of drawers 五斗矮柜Electrical outlet 插座Chest of drawers 藏衣柜Switch 开关TV set 电视柜Air-condition 空调Tea table 茶几Immersion heater 电热水壶Sofa 沙发Electric cooker 电饭褒Reclining chair 躺椅Macrowave oven 微波炉Chair 椅子Refrigeratory 冰箱 American interior design; 美国室内设计
American interior designer; 美国室内设计师
Residential design; 私家住宅设计;
Villa design (single family home design); 别墅设计;
Office design; 办公室设计;
Commercial design; 非住宅设计(商务楼设计;写字楼设计;公共场所设计)
Californian interior design; 加州室内设计
Californian interior designer; 加州室内设计师
Model home design; 样板房设计
Clubhouse interior design;会所室内设计
American furniture design;美国家具设计
Foreign interior design; 外国室内设计
Foreign interior designer; 外国室内设计师 PLAN — 设计方案Interior design – 室内设计Exterior 室外Landscape design – 景观设计Architecture design – 建筑设计designer – 设计师baseplan – 基础建筑图floor plan – 平面图elevation -立面图RCP = 天花吊顶设计 = Reflected Ceiling Planelectric plan = 电线走线图furniture plan – 家具布置平面图interior plant plan – 室内植物摆放图window schedule – 窗表door schedule – 门表美 国室内设计有两种合同:一种叫做specification,就是只设计,不负责采购室内陈设;另外一种是turnkey,字面意思就是交钥 匙,设计师负责设计同时也负责采购室内全部用品用具,包括家具、摆设、艺术皮、画、床上用品、地毯等。后者主要是有钱人家采用的方式比较多,这样才能保证质量。因为设计师更能贯彻自己的设计理念,保证采购回来的东西风格统一并且由于设计师采购的价格是批发价,所以实际上主人并不需要多付钱。Chair Rail – 挡椅线 也可以叫做腰线Picture rair – 挂镜线Baseboard – 踢脚TUB = 浴缸MILL WORK PULL = 橱柜门拉手TOWEL RACK = 毛巾架AREA RUG 装饰地毯(块)
CARPET 地毯(满铺房间)
CORBEL 整梁 承材
COAT HOOK 挂衣架
CROWN MOULDING 天花线条
COFFER 藻井
CERAMIC TILE CLADDING 包覆瓷砖 COUNTER 台面
DOOR PULL 门拉手
DOUBLE PASSAGE DOOR 双门
DRAWER PULL 抽屉拉手
EXTERIOR TILE FLOORING 室外地砖
FAUCET 龙头
FLUSH MOUNT LIGHTING 吸顶灯
GROUT 勾缝剂
HINGE 合页
LOCKERS 锁
LAMINATE 复合板台面
LIGHTING FIXTURE 灯具
LAVATORY / SINK 水盆
MEDALLION 地板拼花
MIRROR 镜子
PAINT-WALLS 墙漆
CEILING PAINT 天花板乳胶漆
PARTITION 隔板 屏风
PLASTER MOULDING 石膏线
RECESSED LIGHT 嵌灯 埋地灯
RECESSED LIGHT IN CABINET 橱柜嵌灯
STONE SLAB 石板
SOAP DISPENSER 肥皂盒
SEMI FLUSH MOUNT 半吸顶灯
SHOWER HEAD AND HANDLES 淋浴莲蓬头和把手
SHOWER SOAP DISPENSER 淋浴间肥皂盒
SINGLE PASSAGE DOOR 单门
STACKED STONE CLADDING 文化石包覆
STONE TILE-WALLS 墙面石材
WOOD STAIN 木染色剂STAIN – 着色WOOD TRUSS – 木桁梁
STONE BASEBOARD 石材踢脚
STONE CROWN 石材装饰线
STEP/RISER LIGHT 楼梯踏步灯
TOWEL BAR 毛巾杆
TOILET SEAT COVERS 座便器坐垫
TILE FLOORING 瓷砖地板
TONGUE AND GROOVE 拼装
TOWEL HOOK 毛巾架
THRESHOLD 门槛
TOILET PAPER HOLDER 卷筒纸架
TRASH RECEPTACLE 废料桶 垃圾桶
URINAL 小便器
VENEER 面板
VENETIAN PLASTER 威尼斯石膏
VENETIAN PLASTER-CEILING 威尼斯石膏 – 天花板
WATER CLOSET/TOILET 厕所
APPLIED WOOD MOULDING 粘贴木线
WOOD BEAM 木梁
WOOD CLADDING-WALLS 木板包覆
WOOD FLOORING 木地板
WOOD PARTITON 木隔板
WROUGHT IRON 铁艺
WALL MURAL 壁画
WALL SCONCE 壁灯 设计英语常用词汇enclosure 围栏void 空间,虚体edifice 大厦,体系aisle 走廊nave (教堂)的正厅chapel 教堂cathedral 大教堂balustrade 栏杆colonnade 柱廊ornament 装饰tensile 空的housing 住房quarters 住宅neighborhood 住宅小区single-family 独户的hallway 门厅tenenment 住房terrace 露台wing 厢房hip 屋脊balcony 阳台

室内设计施工图中PLAN及ELEVATION是什么意思是不是平面及立面

你好!
plan
平面图
elevation
立面图
可以理解为,二维和三维的体现
希望对你有所帮助,望采纳。

>英文版">哪位高手给翻译一下>英文版

Clients (Party):
To take (B):

According to the "Contract Law of People's Republic of China" as well as other relevant laws and regulations of the principle of combining the characteristics of interior decoration, A, B and the two sides through friendly consultations, Party A Party B entrusted to undertake interior design, and reached the following agreement (including this contract Annex added that the contract and all) in order to comply with the common.

I. Party Indoor commissioned the design of the address, chamber, the use - office, the use of 662 square meters area.

Second, Party A Party B entrusted to interior design and construction by Party B, designed to charge 100 yuan per square meter, designed to collect a total fee of RMB yuan.
Party A Party B entrusted to interior design, and B is not responsible for the construction, design charges 100 yuan per square meter, designed to collect a total fee of RMB yuan.
Party A date should be the first to pay 50% of the design fee, and agreed with the B-site measuring time and place. B measurement in the day after the designer to complete floor plan, the top board and the layout plans of the total effect.

Third, the completion of the preliminary design plan B, Party A Party B and designers agree that through communication, fill in the design process (see Annex), signed by the two sides confirmed. Party A shall pay the balance of design, designer B will be months to date, a total of days to complete a full set of design and decoration.
Fourth, after the completion of the drawings, any changes to Party A, B and designers to communicate again. B consultations, according to the program, change the map drawings again to fill in forms design process, from both sides confirmed the signing.
The construction process, designers should have two to three times and setting the scene to guide the construction, designed to achieve results.
The two sides have not signed the construction contract decoration, a full set of design drawings to preserve the information from B, Party A will not be allowed to design drawings and construction cost the company a strap.
Sixth, Party A does not receive the contractual commissioned the construction B is designed according to the original design fee costs 100% of the total income, for a total of yuan. Party A pay increase in the cost of design, from B to a full set of drawings to the use of Party A, B and designers to be responsible for on-site guidance. Party A does not pay the design fee income, should be B flat layout, the top layout, power, telephone, television, multimedia distribution outlet location of the delivery Party.
Seven, breach of duty:
1. Party B is not in the appointed time to complete the design and extension of time within 20 days, every day should be extended to cover design fee of 3% of the total damages to the Party.
2. B extension of more than 21 days to complete the design, Party A has the right to cancel the contract, Party A Party B shall refund the cost of design, and designed to bear 50% of the total cost of damages.
3. Party B to terminate the contract without cause, with the exception of Party A to return the business to pay the costs of design, but also should be provided for the design of the contract fee of 50% of the total price as liquidated damages paid to the Party.
Party A Party B to amend the requirements, such as drawings, drawings completed by the time the two sides agreed separately.
Eight, the design signature of the contract by mutual recognition, the Party must be in accordance with the contract designed to pay expenses. If the Party to go back half-way, B no longer have to refund fees charged by design.
Nine of this contract, if not, through mutual consultation to resolve, but also to the city of interior decoration trade association for mediation or complaints to the Consumer Association. Do not want to party mediation to resolve through negotiation, consultation or mediation is not, can this contract (the following options do not set the resolution to be designated): (1) to the Arbitration Committee for arbitration; (2) to the People's Court Litigation.
10, the annex to the contract, including contracts, the supplemental agreement, the A, B or both signed and sealed after the entry into force.
11, the two copies of the contract, the two sides an armed.
12, the two sides agreed to add the following provisions:
1.
2.
3.
Party A signature (seal): B signature (seal):
Address: Address:
Tel: Tel:
Date date

怎么看cad室内设计图纸

看cad室内设计图纸方法:

要看懂室内装修的cad图纸,首先要了解个图块所表示的是什么东西,如门、窗户、床、电视机等图块,还要知道各个物体边上都需要排什么,如电视机后面要放电源、高清线、电脑链接线等,还要知道各个房间用什么材料等。

卧室一般地面都是地板,卫生间是抛光装,室内装修的图纸主要的是平面布置图,吊顶布置图,电视背景墙里面图等,要注意图纸各房间标高,吊顶标高,灯槽带,以及电视背景特出艺术造型的表达。要如何看懂cad图纸就要多了解室内装修的知识,了解各种图块示意什么设备装置、各个代号代表了什么材质。

看cad室内设计图纸掌握事项:

(1)看空间划分是否合理。首先要找出图中的墙体部分,从面确定各房间的位置,然后与居室的各房间一一对号,获得一个直观的印象。

如果图中所示与实际情况不一致,则说明设计中对墙体结构进行了改动,对空间重新进行了功能划分。这时,就要检查这样的空间划分是否合理,自己对这样的改动是否满意。

(2) 看家具、设施的安排是否得当。首先要识别各种家具和设施的符号,它们在平面图中占了相当大的比例而没有统一的标识,但一般画的都很直观。看懂这些符号,弄清了摆放位置和方向后,就要检查各种家具及设施是否使用方便,安排的是否得当。

比如看客厅,先要找到电视机,它的位置决定了电视柜、沙发的位置,决定了落地灯、背景光源的位置,从而确定了客厅的整体布局。电视机摆放的墙面不同,客厅的效果也会不同。

(3)看地面的装修方式是 否满意。地面平面图一般 都标出地面装修方式,如铺地砖、木地板或地毯等。因地面的面积很大,对装修整体效果的影响也非常大,所以要注意对地面用材、处理是否满意。

室内设计的软件有哪些

1、3ds max

3D Studio Max,常简称为3d Max或3ds MAX,是Discreet公司开发的(后被Autodesk公司合并)基于PC系统的三维动画渲染和制作软件。其前身是基于DOS操作系统的3D Studio系列软件。在Windows NT出现以前,

工业级的CG制作被SGI图形工作站所垄断。3D Studio Max + Windows NT组合的出现一下子降低了CG制作的门槛,首先开始运用在电脑游戏中的动画制作,后更进一步开始参与影视片的特效制作。

2、AutoCAD

AutoCAD具有良好的用户界面,通过交互菜单或命令行方式便可以进行各种操作。它的多文档设计环境,让非计算机专业人员也能很快地学会使用。

在不断实践的过程中更好地掌握它的各种应用和开发技巧,从而不断提高工作效率。AutoCAD具有广泛的适应性,它可以在各种操作系统支持的微型计算机和工作站上运行。

3、Adobe Photoshop

Adobe Photoshop主要处理以像素所构成的数字图像。使用其众多的编修与绘图工具,可以有效地进行图片编辑工作。该软件可分为图像编辑、图像合成、校色调色及功能色效制作部分等。

4、vray

vray为不同领域的优秀3D建模软件提供了高质量的图片和动画渲染。方便使用者渲染各种图片。

5、草图大师

草图大师是一款绘图软件,英文名称为SketchUp,它可以快速和方便地创建、观察和修改三维创意,操作简单。

来源:-Adobe Photoshop

来源:-AutoCAD

来源:-3ds max

来源:-vray

来源:-草图大师

以上就是小编对于问题和相关问题的解答了,希望对你有用


上一篇:国产亚洲AV片在线观看无广告比较好的室内设计app(比较好的室内设计公司有哪些)
下一篇:国产字幕一区二区视频西安有哪些比较好的室内设计公司(西安比较好的室内设计培训学校)

发送评论